Home Pricing Guide

PE Endorsement Cost in Singapore — 2025/2026 Pricing Guide

Transparent fee ranges for all common PE endorsement and QP submission services. Fixed-fee quotes within one working day. No hidden charges.

How Much Does PE Endorsement Cost?

PE endorsement fees in Singapore are not fixed by any authority — they are set commercially by individual PE firms based on the complexity and scope of each project. The table below reflects QP.sg's indicative starting fees for the most common services we handle.

These are starting fees — your specific project may be quoted higher or lower depending on the factors described below. We provide fixed-fee written quotations after reviewing your project documents, so there are no billing surprises.

Service Typical Deliverable From (SGD)
HDB Non-Load-Bearing Wall
Structural assessment letter
PE assessment letter for MCST / HDB filing confirming wall type and structural impact $500
HDB Load-Bearing Wall
PE endorsement + drawings
Structural calculations, endorsed plan drawings for HDB submission $800
Condo / MCST Structural PE
PE endorsement for MCST
Structural assessment + drawings meeting MCST or condo management requirements $800
Mezzanine / Loft
Structural design + PE endorsement
Structural design calculations + endorsed drawings for BCA or MCST $1,200
Temporary Works — Hoarding
MOM/BCA compliant PE endorsement
Hoarding design with PE calculations and endorsement for contractor submission $700
Temporary Works — Scaffolding
PE endorsement for complex scaffolding
Scaffolding structural calculations and PE endorsement under WSH Act $900
BCA A&A Structural Submission
Full submission package
Calculations, endorsed drawings, RFI support for BCA CORENET submission $1,500
Structural Inspection Report
PE site inspection + report
Site visit, condition assessment, written PE report for authority or bank $900
Renovation / A&A PE Endorsement
Residential or commercial
Structural review + PE endorsement for renovation scope $800

* Fees are indicative starting points for typical projects. Complex, multi-authority, or large-scope projects will be quoted higher. Site visits, if required, are quoted separately. All prices exclude GST where applicable.

What Affects PE Endorsement Fees?

📐

Structural Complexity

A non-load-bearing wall letter requires a relatively simple assessment. A mezzanine floor with significant live loads requires detailed structural calculations, section drawings, and connection design — significantly more engineering work.

📄

Documentation Quality

Projects with complete, accurate as-built drawings and clear proposed plans are quicker to assess. Where drawings are missing or unreliable, additional site verification or drawing preparation is required.

🏛

Number of Authorities

Some projects require submissions to multiple agencies — for example, a change-of-use project may require both BCA structural approval and SCDF fire safety review. Each additional authority typically adds to the scope.

Urgency

Standard turnaround is 3–10 working days depending on scope. Priority processing for urgent projects (under 3 working days) may attract a premium. Plan ahead where possible to avoid urgency surcharges.

Common Pricing Questions

QP.sg charges by fixed fee per project scope, not by the hour. We provide a written fixed-fee quotation before any work begins. This protects you from billing surprises and aligns our incentives — we benefit from completing quality work efficiently, not from taking longer.

For RFIs (requests for information) that fall within the original scope of work, QP.sg handles responses at no additional charge. If the authority's queries require additional engineering work beyond the original scope — for example, due to new design requirements or a significant change in project scope — these are quoted separately.

No. Initial enquiries and preliminary scope assessments are complimentary. Send us your project description and any available drawings via WhatsApp or the contact form. We will advise whether PE endorsement is required and provide an indicative fee range before you commit to anything.

GST applicability depends on QP.sg's GST registration status at the time of engagement, which may change. This will be clearly stated in your written quotation before any work commences.

Get Your Fixed-Fee Quote Today

Share your project details and receive a written quotation within one working day. No obligation.