Home QP Submission Singapore

QP Submission Singapore

Qualified Person (QP) appointment and BCA CORENET building plan submission services in Singapore — managed by Er. David Zheng Zhijian, PE (Civil) PEB No. 4385.

What Is a Qualified Person (QP) in Singapore?

A Qualified Person (QP) in Singapore is a registered architect or Professional Engineer appointed under the Building Control Act (Cap. 29) to take responsibility for the design and supervision of building works, and to make formal building plan submissions to the Building and Construction Authority (BCA) on behalf of the building owner or developer.

For structural works, a PE (Civil) acts as QP (Structural) — responsible for structural drawings, calculations, and compliance with BCA's structural requirements. The QP signs all submissions, responds to authority queries, and certifies the completed works.

A QP is not the same as a PE endorsement. PE endorsement is typically for smaller-scope works (HDB renovations, MCST requirements, temporary structures) that do not require a full BCA building plan submission. QP submission is a more formal, ongoing appointment required for significant building works under the Building Control Act.

QP.sg's QP services are provided by Er. David Zheng Zhijian, PE (Civil), PEB Registration No. 4385 — a registered Professional Engineer authorised to act as QP (Structural) for building plan submissions to BCA Singapore. Verify at peb.gov.sg.

When Must You Appoint a QP in Singapore?

QP appointment is a legal requirement under the Building Control Act for these categories of works.

🏗 New Buildings & Major Works

  • New building construction — residential, commercial, or industrial
  • Significant Addition & Alteration (A&A) works requiring BCA approval
  • Change of use that triggers Building Control Act requirements
  • Erection of new structures or substantial extensions to existing buildings

🏠 Renovation & Smaller Works

  • Structural works to landed properties requiring BCA submission
  • Subdivision of buildings or lots requiring structural certification
  • Demolition works requiring BCA notification and QP oversight
  • Retaining walls, basement works, or deep excavations near existing structures
⚠️ Note on QP vs PE Endorsement:

Not all projects need a QP appointment. HDB flat renovations, condo MCST requirements, and temporary works typically only require a PE endorsement, not a full QP submission. QP.sg will advise during the initial consultation which service applies to your project — at no charge. See PE Endorsement →

What QP Submission Involves

QP Appointment

Er. David Zheng is formally appointed as QP (Structural) via a signed QP Appointment form submitted to BCA. This establishes legal responsibility for the structural design and supervision of the works.

Structural Design

Structural drawings and calculations are prepared in accordance with BCA's structural requirements and Singapore's Eurocodes (SS EN 1992–1995). All documents are PE-endorsed by Er. David Zheng (#4385).

CORENET Submission

The full submission package — drawings, calculations, forms, and supporting documents — is filed through BCA's CORENET electronic submission system. QP.sg manages this process end-to-end.

Authority Review & RFI

BCA reviews the submission and may raise Requests for Information (RFIs). QP.sg coordinates all technical responses and resubmissions until written approval is obtained.

Construction Supervision

Where required under BCA's supervision requirements, site inspections at key structural stages are carried out. Supervision records and completion certificates are prepared for BCA filing.

Completion & Certification

Upon completion of structural works, QP.sg prepares and submits the Completion Certificate to BCA, formally closing the QP's appointment for the project.

QP Submission vs PE Endorsement — Which Do You Need?

This is the most common question we receive. The table below summarises the key differences.

Factor PE Endorsement QP Submission
Typical trigger HDB, MCST, landlord, temporary works BCA building plan approval required
Regulatory basis Professional Engineers Act Building Control Act
Authority submission Not always required Always — via BCA CORENET
Ongoing supervision Not required Required at key stages
Completion cert Not required Required for BCA sign-off
Typical fee range S$500 – S$1,500 S$1,500 – S$8,000+
Typical timeline 3–10 working days 4–16 weeks (incl. BCA review)

Not sure which applies to your project? Contact us with a brief project description and we will advise — at no charge.

QP Submission Fees in Singapore

QP submission fees depend on the scale and complexity of the project, number of structural elements, BCA submission requirements, and the level of site supervision required. The table below reflects indicative starting fees.

ServiceTypical ScopeFrom (SGD)
Landed Property A&A (BCA) QP appointment, structural drawings, CORENET submission $1,500
Commercial A&A / Change of Use Full QP appointment + BCA submission + RFI management $2,500
New Residential Build (QP Structural) Full structural design, CORENET submission, supervision $4,000
Demolition Permit Submission BCA demolition notification, method statement endorsement $800
Retaining Wall / Basement Works Structural design + CORENET submission $2,000

* Fees are indicative starting points. All projects receive a fixed-fee written quotation after document review. See full pricing guide →

QP Submission — Common Questions

BCA CORENET (Construction and Real Estate Network) is Singapore's e-submission system for building plan approvals. As the building owner, you do not manage CORENET yourself — this is handled entirely by your appointed QP. QP.sg manages the full CORENET submission process including drawing uploads, form submissions, payment of BCA processing fees, and response to authority queries.

Yes. QP.sg can serve as QP (Structural) and coordinate directly with your appointed architect (QP Architectural) or builder. We manage the structural submission track of the BCA approval independently, and liaise with other consultants and the authority on structural matters throughout the process.

BCA's processing time varies by project type and submission completeness. Straightforward landed property A&A submissions typically receive first response within 4–8 weeks. Complex or incomplete submissions can take longer due to RFI cycles. QP.sg prepares submissions to maximise the likelihood of first-pass approval without RFIs, which is the most effective way to reduce overall approval time.

To initiate a QP submission, you typically need to provide:

  • Survey plan of the property (showing plot boundaries and existing building)
  • Existing as-built drawings (architectural and structural where available)
  • Proposed architectural drawings showing the intended works
  • Grant of Written Permission from URA (if applicable)
  • Site photographs of existing structure
  • Property title deed or strata title

If you don't have all of these, contact us — we can advise what's essential and what can be obtained during the process.

No. Initial consultations and scope assessments are complimentary. WhatsApp Er. David at +65 9800 4385 or use the contact form. We will confirm whether your project requires QP submission or PE endorsement, and provide a fixed-fee quotation before any work begins.

Need a QP for Your Building Works?

Er. David Zheng (PE Civil, PEB No. 4385) provides QP (Structural) appointment and full BCA CORENET submission management. Fixed-fee quotes within one working day.